The MDA Report on Proposed Water Turbine Facilities at the Mytholm Works site seems to lack basic information about the potential of the proposed installation. I can see no figure for the water flow which would enter the turbine. Without this figure, it’s impossible to calculate the potential output of a hydro electricity generator.
This means that there is no evidence to support the Report’s claims about the amount of electricity the proposed installation would generate. These claims are also very unclear, with the Report giving different figures for the power output – either 120-140kW, or 375kW.
Continue reading